What we found
The lowest total leaves electrical out. Cedar’s total ($34,499.57) has no electrical price; Harbor includes it for $6,500.00 and Summit includes it for $7,800.00.
INDEPENDENT CONSTRUCTION INTELLIGENCE
This illustrated Bid Defense Memo identifies documented bid differences, unresolved scope, supporting evidence and written contractor questions before signing. In plain terms: it shows what each bid does and does not cover, and what to ask before you sign.
No login. No document upload. No live AI inference.
The lowest total leaves electrical out. Cedar’s total ($34,499.57) has no electrical price; Harbor includes it for $6,500.00 and Summit includes it for $7,800.00.
The totals are not like-for-like. Part of the gap is work Cedar left to a separate agreement, not savings. How much is unknown: nobody has priced it.
Ask each contractor for the same written scope (electrical, cabinets, sink, finishes), then compare prices.
Stated bid totals and documented electrical lines only. Not a normalized price: Cedar’s electrical cost is unknown and is not estimated here. No savings, adjusted total, winner or ranking.